Overhead Cranes GuideIn Detail

When loads get too big for forklifts and too precise for rough handling, teams turn to overhead cranes. This practical guide follows the journey from bare runways to a commissioned crane ready for service. You’ll see hoist and trolley setup—with the same checklists pro installers use.

Overhead Crane, Defined

At heart, a bridge crane is a bridge beam that spans between two runway beams, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The result is smooth X-Y-Z motion: long-travel along the runway.

You’ll find them in fabrication bays, steel plants, power stations, oil & gas shops, precast yards, and logistics hubs.

Why they matter:

Controlled moves for large, expensive equipment.

Less manual handling, fewer delays.

Repeatable, precise positioning that reduces damage.

High throughput with fewer ground obstructions.

System Components We’re Installing

Runways & rails: runway girders with crane rail and clips.

End trucks: wheel assemblies that ride the rail.

Bridge girder(s): single- or double-girder configuration.

Trolley & hoist: reeving, hook block, upper limit switches.

Electrics & controls: VFDs, radio remote, pendant.

Stops, bumpers & safety: overload protection, e-stops.

Based on design loads and bay geometry, you may be dealing with modest shop lifts or major industrial picks. The choreography is similar, but the scale, lift plans, and checks grow with the tonnage.

Make-Ready & Surveys

Good installs start on paper. Key steps:

Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.

Permits/JSAs: Permit-to-work, hot work, working at height, rigging plans.

Runway verification: Survey columns and runway beams for straightness, elevation, and span.

Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.

Staging & laydown: Lay out slings, shackles, spreader bars, and chokers per rigging plan.

People & roles: Brief everyone on radio calls and stop-work authority.

Millimeters at the runway become centimeters at full span. Spend time here.

Getting the Path Right

Runway alignment is the foundation. Targets and checks:

Straightness & elevation: shim packs under clips to meet tolerance.

Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.

End stops & buffers: Install and torque per spec.

Conductor system: Keep dropper spacing uniform; ensure collector shoe reach.

Record as-built readings. Misalignment shows up as crab angle and hot gearboxes—don’t accept it.

Girder Erection & End Trucks

Rigging plan: Softeners protect painted flanges. Taglines for swing control.

Sequence:

Install end trucks at staging height to simplify mini backhoe bridge pick.

For double-girder cranes, lift both girders with a matched raise.

Use drift pins to align flange holes; torque to spec.

Verify camber and bridge square.

Prior to trolley install, bump-test long-travel motors with temporary power (under permit): ensure correct rotation and brake release. Re-apply LOTO once checks pass.

The Heart of the Lift

Trolley installation: Hoist/trolley arrives pre-assembled or as modules.

Hoist reeving: Lubricate wire rope; verify dead-end terminations.

Limits & load devices: Check overload/SLI and emergency stop.

Cross-travel adjustment: Align trolley rails on a double-girder.

Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.

Grinding noises mean something’s off—stop and inspect. Fix the mechanics first.

Electrics & Controls

Power supply: Conductor bars with collectors or a festoon system.

Drive setup: Enable S-curve profiles for precise positioning.

Interlocks & safety: Zone limits near doors or mezzanines.

Cable management: Secure junction boxes; label everything for maintenance.

Future you will too. Photos of terminations help later troubleshooting.

QA/QC & Documentation

Inspection Test Plan (ITP): Third-party witness for critical steps.

Torque logs: Record wrench serials and values.

Level & gauge reports: Note any corrective shims.

Motor rotation & phasing: Confirm brake lift timing.

Functional tests: Anti-collisions and zone interlocks.

QA/QC is not paperwork—it’s your warranty in a binder.

Proving the System

Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.

Dynamic load test: Travel long-run, cross-travel, and hoist at rated speed with test load.

Operational checks: Emergency stop shuts down all motions.

Training & handover: Operator basics, daily pre-use checks, rigging do’s & don’ts.

Only after these pass do you hand over the keys.

Where These Cranes Shine

Construction & steel erection: placing beams, trusses, and precast.

Oil & gas & power: generator and turbine assembly.

Steel mills & foundries: hot metal handling (with the right duty class).

Warehousing & logistics: bulk material moves with minimal floor traffic.

Floor stays clear, production keeps flowing, and precision goes up.

Controls that Matter

Rigging discipline: rated slings & shackles, correct angles, spreader bars for load geometry.

Lockout/Tagout: test before touch every time.

Fall protection & edges: approved anchor points, guardrails on platforms, toe boards.

Runway integrity: regular runway inspection plan.

Duty class selection: overspec when uncertainty exists.

Safety isn’t a stage—it's the whole show.

Keep It Rolling

Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.

Hot gearboxes: misalignment or over-tight brakes.

Rope drum spooling: check fleet angle and sheave alignment.

Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.

Wheel wear & rail pitting: lubrication and alignment issues.

Little noises are messages—listen early.

Quick Answers

Overhead vs. gantry? Bridge cranes ride fixed runways; gantries walk on the floor.

Single vs. double girder? Span and duty class usually decide.

How long does install take? Anything from a couple weeks to a few months.

What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.

Who Gets the Most Value

Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll gain a checklist mindset that keeps cranes safe and productive.

Want ready-to-use checklists for runway surveys, torque logs, and load-test plans?

Download your pro bundle so your next crane goes in cleaner, faster, and right the first time. Save it to your site tablet for quick reference.

...